Brief Introduction
The mask machine is composed of a non-woven cloth mask body making machine and a mask inner ear belt machine. This machine is a fully automatic machine for the production of mask body. It adopts ultrasonic fusion technology to send in raw materials, insert, cut off, fold the scene, wrap and wrap the edge fusion, shape fusion, shape cutting to the output of finished products. The whole process is automatic and the output is high. In this machine, the elastic belt is fused on both sides of the mask body in ultrasonic mode to complete the finished ear belt mask. Only one operator is required to place one piece of the mask body on the conveyor belt fixture, and the rest of the subsequent actions to the completion of the finished product are automatically operated by the machine.
Work Flow
Automatic Unwinding→Automatic Folding→Ultrasonic Pressing (Cutting)→Separation Of Semi-Finished Products (1:2)→Turning Of Semi-Finished Products→Automatic Pressing Of Ear Belt→Automatic Shaping Of Ear Belt→Automatic Stacking Of Ear Belt→Output Of Finished Mask
Technical Parameters
1
Forming speed
80-120pcs/min
Including cutting time
2
Main motor power
of roll forming
2.7KW+2.3KWx2
Voltage: 220V/50-60Hz/
Air pressure
5-6KG/cm²
Dimensions
About L5800×W2200×H1880mm
Weight
About 3Tons
NO.
Item
Parameters
Remark
3
4
5
Supply List
No. | Item | Number | Remark |
1 |
Placing rack |
1 set |
|
2 |
Automatic leveling device |
1 set |
|
3 |
Folding device of mask body machine |
1 set |
|
4 |
Automatic folding, welding and cutting device |
1 set |
|
5 |
Loading conveyor belt |
1 set |
|
6 |
Ear band welding machine |
2 sets |
|
7 |
Finished product conveyor belt |
2 sets |
|
8 |
PLC Control System |
4 sets |
|
Mask Forming Machine
Ear Band Welding Machine
Producing time: about 10 workdays after received the payment Period of Validity for Price: 30 days from quotation date
Packing method: with nude packing steadily fixed in container suitable for long-distance transportation.
OTHER TERMS:
1. Electric standard: 380V/50Hz/3Ph--should be confirmed
2. Major Color of Machine Painting: Blue(RAL5015)+Orange(RAL2004)-factory standard or customized
3. TERMS OF PAYMENT: 100% Deposit is required within five (5)-business days from the contract signing date
4.TESTING MATERIAL: It is the responsibility of the buyer to supply sufficient testing material at least 25 days prior to shipment; all costs relating to the local transport, customs clearance and local taxes for the sample material will be paid bythe customer.
5.After sale service:
1)In correct operation & maintaining, the machine is guaranteed for 12months from the date of the successful installation and commissioning of the equipments at the Buyer’s Installation site.(the spare parts stock are available for IMMDEIATELY SERVICE);
2) If necessary, we will dispatch a technician to the factory abroad to install & regulate the machine with USD100/day. The buyer should assist our technician to get the visa and should pay for the air around ticket and the local accommodation.