Please Click Here To View The Video
Twin Batten Purlin Roll Forming Machine
Profile
Material
Feeding Width:235/395mm
Material Thickness:0.7-1.2mm
Applicable Material:GI
With Yield Strength:390Mpa
Work Flow
3T Manual Uncoiler→Feeding Guide Device→Hydraulic Pre-Punching Device→Roll Forming System→Hydraulic Post Cutting Device→Exit Rack
Machine Components
1) 3T Manual Uncoiler:one set
Manual Control Steel Coil Inner Bore Shrinkage And Stop
Auto Feeding Power And Self-Stop Device
Max Feeding Width:300mm
Inside Coil ID Range:508mm±30mm,Outside Diameter:1600mm
Capacity:Max.5 Ton.With Two Coil
2) Hydraulic Pre-Punching Device
Punching Material Use Cr12MoV Steel(=SKD11 Steel)
3) Main Machine
With Feeding Material Guide Device
Body Frame Made From H450 type Steel
Side Wall Thickness:Q235 t18mm
Rollers Manufactured From 45# Steel,Hard Chrome Coated
Shafts Diameter=ф75mm,High Frequency Processing
Gear/Sprocket Driving,Right 16-step & Left 11-step To Form
Main Motor=11KW,Frequency Speed Control
Roll forming Speed:20-25m/min
4) Post Hydraulic Cutting Device
Post To Cut,Stop To Cutting,Two Pieces Type Of Cutting Blade Design
Hydraulic Motor:4KW;Cutting Pressure:0-16Mpa
Cutting Tool Material:Cr12MoV(= SKD11 Steel),Heat treatment to HRC58-62
With At Least One Million Times Of Cutting Life
The Cutting Power Is Provided By The Main Engine Hydraulic Station
5) PLC Control System
Control The Quantity And Cutting Length Automatically.
Input The Production Data(Production Batch,pcs,Length,etc.)On The Touch Screen.
It Can Finish The Production Automatically.
Combined With: PLC, Inverter, Touch Screen, Encoder, etc.
6) Exit Rack:Two Units
Product Show
Packing Style
Packing method: Main body of machine is naked and covered by plastic film(to protect of dust and corrosion),loaded into container and steadily fixed in container suitable by steel rope and lock, suitable for long-distance transportation.
PLC Packing By Wood Box
After-Sale Service
1. The warranty is 24 months after the client receives the machine.Within the 24 months, we will courier the replacement parts to the client free of charge.
2. We offer technical support for the entire life of our machines.
3. We can send our technicians to install and train the workers in the clients' factories with extra cost.
Terms Of Trade
1.Minimum order quantity (MOQ): 1 Set
2.Delivery time: about 45 workdays
3.Port of loading: port of Xiamen
4.Type of payment: by T/T or by L/C
5.Export:to more than 50 countries and regions, including Taiwan, UK, France, Singapore,India,Greece, Australia, USA, Mexico, Brazil, Chile, Bolivia, Trinidad, Israel, Saudi Arabia, etc